Pendle local plan
The plans Pendle decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Pendle Local Plan Fourth Edition 2021-2040, adopted 18 December 2025, 2021 to 2040
- Joint Lancashire Minerals and Waste Development Framework Core Strategy DPD (Managing our Waste and Natural Resources), adopted February 2009, to 2021
- Joint Lancashire Minerals and Waste Local Plan: Site Allocation and Development Management Policies (Parts One and Two), adopted September 2013, to 2021
Emerging plans
- Pendle Local Plan 5th Edition, 2025 to 2045
Started under the new plan-making system. The local plan timetable and the notice of intention to commence local plan preparation were published on 30 June 2026 (https://www.pendle.gov.uk/download/downloads/id/12731/notice_of_intention_to_commence_local_plan_preparation.pdf), giving Friday 30 October 2026 as the start of the 30-month process. The scoping report (August 2026, https://www.pendle.gov.uk/download/downloads/id/12793/local_plan_scoping_report.pdf) and a call for sites were consulted on from 14 August to 14 September 2026. The timetable (https://www.pendle.gov.uk/lp5-timetable; last reviewed 30 September 2026, "No change required") gives the Gateway 1 self-assessment on 30 October 2026 and the summary of the scoping consultation on 6 November 2026; the council's news page lists both as published, without dates (https://www.pendle.gov.uk/lp5-latestnews). Next: consultation on proposed content and evidence, 18 June 2027 to 2 August 2027; consultation on the proposed plan 12 May 2028 to 10 July 2028; submission 30 October 2028; adoption 30 April 2029. It will replace the Fourth Edition when adopted.
Free with any account
Pendle’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 2 Article 4 directions, and what each removes
- 4 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in Pendle?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Pendle’s own published plans and pages on 26 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
