Peterborough local plan
The plans Peterborough decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Peterborough Local Plan, adopted 24 July 2019, 2016 to 2036
- Cambridgeshire and Peterborough Minerals and Waste Local Plan, adopted 28 July 2021, to 2036
Emerging plans
- Peterborough Local Plan 2024-2043 (Proposed Submission), 2024 to 2043
Regulation 19 publication. The council's page: "The Proposed Submission Peterborough Local Plan 2024-2043 is available for public consultation", from 9am on 2 October to 11:59pm on 12 November 2026. Completed steps: Full Council agreed to prepare a new plan in January 2023; Issues and Options (Regulation 18) consultation in July 2023, with a key issues report in November 2023 and calls for sites in 2023 and October 2024; Draft Local Plan (Regulation 18) consultation from 11 April to 29 May 2025; an alternative site option (land west of Wittering) consulted on from 23 January to 5 March 2026, key issues report May 2026; Cabinet approved the Proposed Submission plan for consultation on 25 August 2026 (decision Key/06APR26/01, published 26 August 2026), a decision then called in to the Economy, Inclusive Growth and Environment Scrutiny Committee. The council's timetable then gives submission (Regulation 22) in December 2026 (it must be submitted by 31 December 2026 under the transitional arrangements), examination December 2026 to June 2027, the Inspector's report in July 2027 and adoption in September 2027. Plan period 1 April 2024 to 31 March 2043, about 20,825 homes and 196 ha of employment land (Cabinet report of 25 August 2026). The Draft Local Plan of April 2025 ran to 2044.
- Cambridgeshire and Peterborough Minerals and Waste Local Plan Review
Scoping. Notice of intention to commence published on 3 August 2026; Regulation 45 scoping consultation, with a call for sites, "from Monday 3 August 2026 to Monday 12 October 2026" (closed). The joint timetable then gives the self-assessment summary on or after 1 March 2027, content and evidence consultation on or after 1 October 2027, gateway 2 on or after 1 March 2028, the proposed plan consultation on or after 1 September 2028, gateway 3 on or after 1 January 2029 and submission on or after 1 February 2029.
Free with any account
Peterborough’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 7 zones
- 3 Article 4 directions, and what each removes
- 7 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in Peterborough?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Peterborough’s own published plans and pages on 28 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
