Portsmouth local plan
The plans Portsmouth decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- The Portsmouth Plan (Portsmouth Core Strategy), adopted 24 January 2012, 2010 to 2027
- Portsmouth City Local Plan 2001-2011 (saved policies), adopted 21 July 2006
- Southsea Town Centre Area Action Plan, adopted July 2007
- Somerstown and North Southsea Area Action Plan, adopted 17 July 2012
- Hampshire Minerals and Waste Plan (2026), adopted 14 July 2026, to 2040
Emerging plans
- Portsmouth Local Plan to 2040, 2020 to 2040
At examination. Regulation 18 consultation September 2021. Regulation 19 publications: the Pre-Submission Local Plan, 9 July to 3 September 2024, and the Pre-Submission Addendum 2025, 18 November 2025 to 8 January 2026. Submitted on 18 March 2026; three Inspectors appointed on 23 March 2026. The council submitted suggested main modifications on 9 June 2026. Matters, Issues and Questions issued on 19 August 2026; hearings begin on 6 October 2026 (initial programme 6 to 9 October 2026). No Inspectors' report by 5 October 2026.
- Future Portsmouth Plan, 2029 to 2045
Preparation under the new local plan system. Notice of intention to commence published 14 July 2026; scoping consultation 29 September to 2 November 2026. The timetable has submission in August 2028 and adoption in April 2029.
Free with any account
Portsmouth’s figures
- Five-year housing land supply, measured at 31 March 2025
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes
- 1 neighbourhood plan, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Portsmouth?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Portsmouth’s own published plans and pages on 5 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
