Redditch Borough Council local plan
The plans Redditch Borough Council decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Borough of Redditch Local Plan No. 4 (2011-2030), adopted 30 January 2017, 2011-2030
- Worcestershire Minerals Local Plan 2018 - 2036, adopted 14 July 2022, 2018-2036
- Worcestershire Waste Core Strategy Local Plan 2012-2027, adopted 15 November 2012, 2012-2027
Emerging plans
- Borough of Redditch Local Plan (new local plan, to 2044; planning.data.gov.uk calls it Local Plan No. 5), to 2044
Being prepared under the new plan-making system. Earlier, under the old system, an Issues and Options consultation and Call for Sites ran from 22 May to 3 July 2025 (the call for sites remains open, 'for the period to 2043'); the council says this work 'will be rolled forward into the new plan making system'. Council on 29 June 2026 approved the notice, timetable and scoping document. Notice of intention to commence published 29 June 2026 ('It is anticipated that formal commencement of the 30-month plan preparation process will begin in October 2026'); timetable published 29 June 2026; scoping consultation 3 July to 14 August 2026 (closed; a summary of responses has been published, undated). Timetable still to come: Gateway 1 self-assessment summary October 2026 (not confirmed as published); content and evidence consultation June to July/August 2027; Gateway 2 October to November/December 2027; proposed local plan consultation March to April/May 2028; Gateway 3 August to October 2028; submission for examination October 2028; adoption April 2029. It will replace Local Plan No. 4.
Free with any account
Redditch Borough Council’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 1 Article 4 direction, and what each removes
- How the plan draws its settlements
Checking a property in Redditch Borough Council?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Redditch Borough Council’s own published plans and pages on 19 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
