GoPlanner

Councils

Ribble Valley local plan

The plans Ribble Valley decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Ribble Valley Local Plan (new Local Plan, under the Town and Country Planning (Local Planning) (England) Regulations 2026)

    Early preparation under the new plan-making system: scoping consultation held. The council published its Notice of Intention to Commence Local Plan Preparation on 14 May 2026, with a Local Plan Timetable that "formally replaces" the Local Development Scheme published 27 November 2025; the scoping consultation ran from Friday 3 July 2026 to 17:00 on Friday 14 August 2026 (Read Parish Council's copy of the council's notice, dated 8 July 2026, https://www.read-pc.gov.uk/news/post/25/notice-of-local-plan-scoping-consultation-regulations-20-/, and the council's Planning Policy Consultation page). The timetable sets Gateway 1 for 14 September 2026, starting the 30-month preparation period (not confirmed as held); proposed content and evidence consultation 11 January to 22 February 2027; Gateway 2 April to May 2027; Proposed Local Plan consultation 4 October to 29 November 2027; Gateway 3 February 2028; submission 27 March 2028; examination 27 March to 28 September 2028; adoption 30 November 2028. It replaces the Local Plan Review begun under the 2012 Regulations, whose Regulation 18 Strategic Matters consultation "took place in May 2022" (the council's page; planning.data.gov.uk gives 27 May to 6 July 2022), and whose responses "will inform the preparation of the new Local Plan". It will replace the Core Strategy 2008-2028 (and, presumably, the HED DPD).

Free with any account

Ribble Valley’s figures

  • Five-year housing land supply, measured at 31 March 2026
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 4 Article 4 directions, and what each removes
  • 1 neighbourhood plan, with the dates they were made
  • How the plan draws its settlements

Checking a property in Ribble Valley?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Ribble Valley’s own published plans and pages on 26 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.