GoPlanner

Councils

Rossendale local plan

The plans Rossendale decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Rossendale Local Plan

    Early preparation under the new plan-making system (the 2026 Regulations), with the Call for Sites open. Notice of intention to commence published 11 May 2026; scoping consultation 15 June to 27 July 2026 ("We are now assessing the comments we received"); Call for Sites from 30 September 2026; Gateway 1 self-assessment summary timetabled for 30 October 2026, starting the 30-month preparation period. The Local Plan Timetable (https://www.rossendale.gov.uk/local-plan/new-rossendale-local-plan/5, last updated 19 November 2026) gives the end of the Call for Sites as 2 December 2026, consultation on plan content and evidence from 15 May to 30 June 2027, Gateway 2 15 September 2027, the proposed plan consultation 1 June to 30 July 2028, Gateway 3 1 September 2028, submission 31 October 2028 and adoption considered on 30 April 2029. No plan period is stated.

Free with any account

Rossendale’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 8 Article 4 directions, and what each removes
  • 1 neighbourhood plan, with the dates they were made
  • How the plan draws its settlements

Checking a property in Rossendale?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Rossendale’s own published plans and pages on 26 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.