GoPlanner

Councils

Runnymede Borough Council local plan

The plans Runnymede Borough Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Runnymede Local Plan (new-style), A 10-year plan period is the council's preference ('Subsequent sections of this consultation set out the Council's preference for a 10-year plan period', https://www.runnymede.gov.uk/scoping-consultation/local-plan-%E2%80%99s-changed); no dates given

    Getting ready, under the new plan-making system: the Local Plan scoping consultation ran from 7 September 2026 to 11.59 pm on 12 October 2026, and the responses are being reviewed, with a Summary of Scoping Consultation Report expected at the Planning Committee 'most likely on 16 December 2026' (https://www.runnymede.gov.uk/local-plan/local-plan-faqs-latest-news, last updated 15 October 2026). Earlier steps: the Planning Committee approved the Local Plan timetable on 25 February 2026; the call for sites ran from 17 September 2025 to 19 October 2025; the notice of intention to commence plan-making was given on 29 June 2026 under regulation 19(1) of the Town and Country Planning (Local Planning) (England) Regulations 2026 (https://www.runnymede.gov.uk/local-plan/localplannotices); the Local Plan Engagement Strategy was approved by the Planning Committee on 22 July 2026; the strategic environmental assessment scoping consultation ran 7 September to 19 October 2026. Next, in the timetable as at 24 September 2026 (https://www.runnymede.gov.uk/local-plan/localplantimetable): Gateway 1 self-assessment, published on 30 October 2026, 'which will start the 30-month plan preparation process'; public consultation on a Vision and Strategy 1 June to 13 July 2027; Gateway 2 November to December 2027; an 8-week consultation on the plan 5 April to 31 May 2028; Gateway 3 August to September 2028; submission 30 September 2028; examination October 2028 to March 2029; adoption, indicatively, April 2029. Runnymede is to be part of West Surrey Council from 1 April 2027 (the scoping consultation's 'What is a Local Plan and what's changed?' page), which will take the plan forward. The new plan has no weight yet.

Free with any account

Runnymede Borough Council’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 7 zones
  • 1 Article 4 direction, and what each removes
  • 4 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Runnymede Borough Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Runnymede Borough Council’s own published plans and pages on 21 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.