GoPlanner

Councils

Rushcliffe local plan

The plans Rushcliffe decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Greater Nottingham Strategic Plan, 2023 to 2041

    At examination: a joint strategic plan of Broxtowe, Nottingham City and Rushcliffe which will replace the Rushcliffe Local Plan Part 1: Core Strategy (Gedling withdrew). Rushcliffe's page (https://www.rushcliffe.gov.uk/planning-growth/planning-policy/greater-nottingham-strategic-plan/, read 12 November 2026): Growth Options consultations July 2020 and February 2021; Preferred Approach (December 2022), "The consultation closed on 14 February 2023"; Distribution and Logistics Preferred Approach (September 2023), "The consultation closed on 7 November 2023"; "In November 2024 there was a consultation on the Publication Draft" and "Gedling Borough Council decided to withdraw from the Greater Nottingham Strategic Plan"; "We published the Greater Nottingham Strategic Plan Publication Draft (as revised) in March 2025", "The consultation on the draft Strategic Plan closed on Friday 25 April 2025"; "The draft Greater Nottingham Strategic Plan was submitted for examination on 22 December 2025." The page records nothing later. From the Broxtowe and Nottingham entries (Regulation 24 notice, https://www.broxtowe.gov.uk/media/kf4j5jns/regulation-24-notice-gnsp.pdf, and the examination website, https://www.localplanservices.co.uk/gnspexamination, read 9 and 11 November 2026, not re-read here): Inspectors G Davies, U P Han and F Bradley; hearings 14 to 16 July 2026 at Broxtowe Council Offices, Beeston, and 21 to 23 July 2026 at County Hall, West Bridgford; Post Hearing Note 1 (ID6) 14 August 2026; Councils' response (GNC35) 16 September 2026; Post Hearing Note 2 (ID7) 7 October 2026; Councils' Sustainability Appraisal of proposed Main Modifications (GNC36 to GNC38) 5 November 2026, Main Modifications consultation to follow. The scoping document for the new Rushcliffe Local Plan (https://www.rushcliffe.gov.uk/media/ya0hpund/local-plan-scoping-document.pdf): the GNSP "is currently being examined by Planning Inspectors to determine whether it can be adopted"; "If adopted, the GNSP would remain in force until it is replaced by the new Rushcliffe Local Plan."

  • Rushcliffe Local Plan

    Early preparation under the Town and Country Planning (Local Planning) (England) Regulations 2026, to replace both the Local Plan Part 1 and Part 2 (page, https://www.rushcliffe.gov.uk/planning-growth/planning-policy/new-rushcliffe-local-plan/: "The Council is preparing a new Rushcliffe Local Plan, that is due to be finalised in 2029."). Completed steps: timetable "approved by the Council's Cabinet at its meeting on 23 June 2026" (timetable statement, https://www.rushcliffe.gov.uk/media/i3raqt2y/rushcliffe-local-plan-timetable-statement-30-june-2026.pdf); Notice of Intention to Commence Local Plan Preparation published 30 June 2026 (https://www.rushcliffe.gov.uk/media/3kqc5x0z/rushcliffe-local-plan-notice-to-commence-30-june-2026.pdf); scoping consultation 17 September 2026 to 5pm on Friday 23 October 2026 (scoping document, https://www.rushcliffe.gov.uk/media/ya0hpund/local-plan-scoping-document.pdf). Planned (timetable v1, https://www.rushcliffe.gov.uk/media/5nffzmir/rushcliffe-local-plan-timetable-v1-30-june-2026.pdf; "The timetable will be reviewed monthly and updated where necessary"): Gateway 1, publication of self-assessment summary, 31 October 2026 ("The 30-month plan preparation process is expected to start on 31 October 2026"); plan content and evidence consultation 17 May 2027 to 28 June 2027; Gateway 2 5 September 2027; proposed Local Plan consultation 15 May 2028 to 10 July 2028; Gateway 3 4 September 2028; submission for examination 2 October 2028; adoption 30 April 2029. No draft policies yet. The scoping document gives no end date, only that the strategy must look ahead "over a period of at least ten years from the date the Local Plan is adopted".

  • Nottinghamshire Minerals Local Plan 2045, to 2045

    Early preparation under the Town and Country Planning (Local Planning) (England) Regulations 2026, jointly by Nottinghamshire County Council and Nottingham City Council, to cover "the administrative areas of Nottinghamshire County Council (ONS code E10000024) and Nottingham City Council (ONS code E60000075)" and continue to do so after local government reorganisation in April 2028 (notice, https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/notice-of-intention-to-commence-preparation). Completed steps: notice of intention to commence plan preparation and timetable published 31 July 2026; scoping consultation from 12 October to 5pm on Monday 9 November 2026 (closed the day before this research; https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/new-minerals-local-plan). Planned (timetable, https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/local-plan-timetable; "all dates are subject to change"): call for sites early 2027; Gateway 1 self-assessment 16 April 2027 (when "the councils expect to begin the 30-month plan preparation process"); content and evidence consultation 19 November 2027 to 14 January 2028; Gateway 2 28 April 2028; proposed plan consultation 11 September to 13 November 2028; Gateway 3 26 January 2029; submission 16 March 2029; adoption 20 September 2029. No draft policies yet; the adopted Minerals Local Plan (2021) "will remain in force" until then.

Free with any account

Rushcliffe’s figures

  • Five-year housing land supply, measured at 31 March 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 5 zones
  • 1 Article 4 direction, and what each removes
  • 12 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Rushcliffe?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Rushcliffe’s own published plans and pages on 12 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.