GoPlanner

Councils

Rushmoor local plan

The plans Rushmoor decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Aldershot and Farnborough (Rushmoor Borough) Local Plan (new Local Plan, under the 2026 plan-making system)

    Gateway 1 self-assessment summary made available on 21 September 2026, which starts the 30-month plan-making process ('Publication of the Gateway 1 self-assessment starts the 30-month plan-making process', Report PG2610, para 3.10: https://democracy.rushmoor.gov.uk/documents/s16295/Local Plan scoping consultation - Report No. PG2610 1.pdf). Completed steps: notice of intention to commence Local Plan preparation published 18 May 2026 (it said 'We intend to start the 30-month plan preparation process on 18 September 2026'); scoping consultation, notice published 19 June 2026, representations by 5pm on 31 July 2026 (https://www.rushmoor.gov.uk/planning-and-building-control/planning-policies/the-rushmoor-local-plan/new-local-plan/local-plan-notices/); Gateway 1 self-assessment summary, 21 September 2026. Next: content and evidence consultation, notice 1 February 2027, representations by 15 March 2027; Gateway 2 observations and advice sought 1 August 2027; proposed Local Plan consultation, notice 17 January 2028, representations by 13 March 2028; Gateway 3 advice sought 1 June 2028; submission for examination 31 July 2028; considered for adoption 22 February 2029. The timetable (version 1.0) had effect from 25 March 2026, updated as version 2.0 on 26 August 2026 and version 3.0 on 21 September 2026 (https://www.rushmoor.gov.uk/planning-and-building-control/planning-policies/the-rushmoor-local-plan/new-local-plan/local-plan-timetable/).

Free with any account

Rushmoor’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 5 Article 4 directions, and what each removes
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Rushmoor?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Rushmoor’s own published plans and pages on 14 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.