GoPlanner

Councils

Rutland local plan

The plans Rutland decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Rutland Local Plan 2021 to 2041, 2021 to 2041

    At examination, after the main modifications consultation; the inspector's report is awaited. Completed steps: Issues and options consultation (June 2022); Regulation 18 preferred options consultation "from Monday 13 November 2023 to 4pm Monday 8 January 2024"; Regulation 19 consultation "9am on Monday 21 October 2024 to 4pm on Monday 2 December 2024"; "formally submitted to the Planning Inspectorate on 28 February 2025"; hearing sessions from Wednesday 10 September 2025, with an employment session on 13 November 2025; post-hearings consultation 5 January to 16 February 2026; inspector's post hearings letter (ID9) on 2 April 2026; main modifications consultation from Monday 27 July 2026 to 4pm Monday 7 September 2026; a consultation on the council's updated five-year land supply report (RCC73) and housing supply note (RCC74), 5 to 26 October 2026, its representations sent to the inspector (news of 30 October 2026). The inspector is Katie Child. Sources: examination latest news (this URL); https://www.rutland.gov.uk/planning-building-control/local-plan/submitted-local-plan-2021-2041/submitting-adopting-local-plan; https://www.rutland.gov.uk/planning-building-control/local-plan/submitted-local-plan-2021-2041/main-modifications-consultation; https://www.rutland.gov.uk/planning-building-control/local-plan/submitted-local-plan-2021-2041/local-plan-examination/hearing-sessions; https://www.rutland.gov.uk/planning-building-control/local-plan/submitted-local-plan-2021-2041/preferred-options-draft-local-plan-consultation-regulation-18; https://www.rutland.gov.uk/planning-building-control/local-plan/new-local-plan/finalising-submission-draft-plan-regulation-19. An earlier Rutland Local Plan 2018 to 2036, submitted on 3 February 2021, was withdrawn (adopted plan page).

Free with any account

Rutland’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes
  • 17 Article 4 directions, and what each removes
  • 12 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Rutland?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Rutland’s own published plans and pages on 8 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.