GoPlanner

Councils

Sandwell Metropolitan Borough Council local plan

The plans Sandwell Metropolitan Borough Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Sandwell Local Plan 2024 to 2041, 2024 to 2041

    At examination, awaiting the Inspectors' report. Issues and Options, February to March 2023; Draft Plan (Regulation 18), 6 November to 18 December 2023; Publication (Regulation 19), 23 September to 11 November 2024; submitted to the Secretary of State on 11 December 2024; Inspector C Jack appointed 2 January 2025; consultation on three proposed modifications, 28 April to 9 June 2025; hearings from 15 July 2025 and 23 to 26 September 2025; Inspector's post-hearings letter (SA/ED84) of 14 October 2025; Cabinet approved the Main Modifications on 4 February 2026; Main Modifications consultation, 16 February to 30 March 2026; a second Inspector (Rivett) appointed on 29 June 2026 to work alongside Inspector Jack. The council's pages (latest update 29 June 2026) say it 'is unable to adopt the Sandwell Local Plan as policy until the final report is received'; the stages table had expected adoption in 'Summer 2026'. Once adopted it will 'replace the Black Country Core Strategy, the SAD and the AAPs'.

  • Sandwell Local Plan 2 (2026 to 2044), 2026 to 2044

    Started under the new plan-making system. Notice of intention to commence plan preparation, 30 June 2026 (timetable in effect from that date); scoping consultation 27 July to 11 September 2026; Gateway 1 self-assessment summary published 30 October 2026, the start of the 30-month period. Planned (first-of-month dates are placeholders): consultation on proposed plan content and evidence January to February 2027; Gateway 2 September 2027; consultation on the proposed draft plan February to March 2028; Gateway 3 July 2028; submission September 2028 to March 2029; adoption April 2029.

  • West Midlands Spatial Development Strategy

    Early preparation by the West Midlands Combined Authority, covering the seven metropolitan boroughs including Sandwell; a first consultation from 3 November 2025, with a first draft 'most likely in 2027' (WMCA news release, https://www.wmca.org.uk/news/public-to-have-their-say-on-where-thousands-of-new-homes-should-be-built/, as recorded in Wolverhampton's entry). The submitted Sandwell Local Plan examination library holds 'Strategic Development Strategy, update as of November 2025' (SA/ED86).

Free with any account

Sandwell Metropolitan Borough Council’s figures

  • Five-year housing land supply, measured at 1 April 2024
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 2 zones
  • 3 Article 4 directions, and what each removes
  • How the plan draws its settlements

Checking a property in Sandwell Metropolitan Borough Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Sandwell Metropolitan Borough Council’s own published plans and pages on 15 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.