GoPlanner

Councils

South Kesteven District Council local plan

The plans South Kesteven District Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • South Kesteven Local Plan (new plan, 2026 to 2046), 2026 to 2046

    Early preparation under the Town and Country Planning (Local Planning) (England) Regulations 2026; the formal 30-month process has not started and there is no draft plan. Completed steps: "On 21st July 2026 South Kesteven District Council resolved to cease production of the Local Plan Review" and to move to the new system (https://www.southkesteven.gov.uk/planning-building-control/planning-policy-local-plans/new-south-kesteven-local-plan); the council "agreed a timetable on 21 July 2026" (FAQ, https://www.southkesteven.gov.uk/frequently-asked-questions); Notice of Intention to Commence Local Plan Preparation and Local Plan Timetable published on 28 October 2026 ("Wednesday 28th October 2026", https://www.southkesteven.gov.uk/planning-building-control/planning-policy-local-plans/notice-intention-commence-local-plan; the timetable "takes effect from 28th October 2026", https://www.southkesteven.gov.uk/planning-building-control/planning-policy-local-plans/local-plan-timetable); a call for sites runs "Wednesday 28th October 2026 – Wednesday 9th December 2026" (https://www.southkesteven.gov.uk/planning-building-control/planning-policy-local-plans/new-south-kesteven-local-plan). Planned (timetable page and its dataset, https://www.southkesteven.gov.uk/sites/default/files/2026-10/plan-timetable.csv): scoping consultation 6 January 2027 to 3 February 2027; Gateway 1 self-assessment 17 March 2027 (starting the 30-month timeframe); consultation on proposed plan content and evidence 12 January 2028 to 23 February 2028; Gateway 2 advice sought 21 June 2028; consultation on the proposed plan 11 October 2028 to 6 December 2028; Gateway 3 7 February 2029; submission for examination 21 February 2029; adoption 22 August 2029. The council's dataset (https://www.southkesteven.gov.uk/sites/default/files/2026-10/local-plan.csv) names it "South Kesteven Local Plan 2026-2046", required housing 17900. Superseded: the Local Plan Review (to 2041 in the LDS, "up to 2043" on the review page), whose completed steps were Issues and Options (Regulation 18) 12 October to 23 November 2020, the Regulation 18 Draft Local Plan 29 February to 25 April 2024, and the Regulation 18 Proposed Housing and Mixed-Use Site Allocations 3 July to 28 August 2025 (https://www.southkesteven.gov.uk/localplanreview); its Regulation 19 stage, planned for September to October 2026 in the LDS 2026-2029 (https://www.southkesteven.gov.uk/sites/default/files/2026-01/Local%20Development%20Scheme%202026%20-%202029.pdf, Table 2), was never reached.

  • Lincolnshire Minerals and Waste Local Plan (update, to 2042), to 2042

    Proposed Submission Version (Regulation 19 of the 2012 Regulations) consultation closed on 31 July 2026; not yet submitted as at 12 November 2026. The county's page (https://www.lincolnshire.gov.uk/planning/minerals-waste/2): "The updated Plan will replace both parts of the adopted Plan and cover the period to 2042. ... The Plan has undergone two formal consultation stages under Regulation 18 of the Town and Country Planning (Local Planning) (England) Regulations 2012 (as amended) (2012 Regulations), an Issues and Options consultation in mid 2022 and a Preferred Approach consultation in mid 2024." "Consultation on the Lincolnshire Minerals and Waste Local Plan: Proposed Submission Version, in accordance with Regulation 19 (of the 2012 Regulations), took place between 15 June 2026 and 5pm on 31 July 2026. This was the final chance to comment on the emerging Minerals and Waste Local Plan before it is sent to the Secretary of State for independent examination." Completed steps: the county resolved to update the plan in 2021 (following its review of February 2021, https://www.lincolnshire.gov.uk/downloads/file/5053/review-of-the-lmwlp-19-2-21-accessible-version-); Issues and Options (Regulation 18), "Summer 2022"; Preferred Approach (Regulation 18), "Summer 2024"; Proposed Submission (Regulation 19), 15 June to 31 July 2026. Next (Minerals and Waste Development Scheme, February 2026, https://www.lincolnshire.gov.uk/downloads/file/10749/minerals-and-waste-development-scheme-february-2026): "Submission (Regulation 22)– Final draft of plan submitted to Secretary of State ... December 2026"; "Examination ... Summer/Autumn 2027"; "Adoption – Inspector’s final report and adoption by Full Council – Winter 2027". The new plan "will consolidate the two adopted DPDs into one Local Plan, for a plan period to the end of 2042" (para 4.2). Consultation portal: http://www.letstalk.lincolnshire.gov.uk/mwplan-2026 (not opened).

Free with any account

South Kesteven District Council’s figures

  • Five-year housing land supply, measured at 1 April 2024
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 1 Article 4 direction, and what each removes
  • 18 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in South Kesteven District Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from South Kesteven District Council’s own published plans and pages on 13 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.