South Oxfordshire local plan
The plans South Oxfordshire decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- South Oxfordshire Local Plan 2011-2035, adopted 10 December 2020, 2011 to 2035
- Oxfordshire Minerals and Waste Local Plan: Part 1 - Core Strategy, adopted 12 September 2017, to 2031
- Oxfordshire Minerals and Waste Local Plan 1996 (saved area policies), adopted July 1996, to 2006
Emerging plans
- South Oxfordshire and Vale of White Horse Joint Local Plan 2041, 1 April 2021 to 31 March 2041 as submitted (Statement of Submission, CSD11); the Inspectors' letter of 15 September 2026 (ID28) proposes main modifications moving the base date to 2025 and extending the period by a year
At examination; stage 3 hearings to begin on 17 November 2026. Steps, latest first: 7 October 2026 Housing Land Supply Statements (LPA97, LPA98) added to the examination library; 1 October 2026 Stage 3 Regulation 24 notice (LPA96); 30 September 2026 'The Third Stage of Hearing Sessions will commence at 09:30am on Tuesday 17 November 2026' at Bee House, with Part 3 matters, guidance and draft programme (ID29 to ID31; Matters 6 to 19: site allocations, garden villages, housing supply, housing policies, climate change, environment, jobs, town centres, design, healthy places, nature, infrastructure, viability, monitoring); 16 September 2026 (letter dated 15 September) the Inspectors' post-hearing letter (ID28), which says main modifications are needed to move the plan's base date to 2025 and extend the plan period by a year, with consequential changes to Policies SP1 and SP7 (including Thame's housing requirement), and asks for housing supply evidence based on 1 April 2027; 9 September 2026 focused hearing session; 29 July 2026 Inspectors' note on a post-hearings written consultation on nine council documents (ID25), statements due 24 August 2026; 7 July 2026 stage 2 hearings began at Abbey House; 24 April 2026 programming and next steps letter (ID16); 12 February 2026 procedural meeting; 1 October 2025 post-hearings letter after stage 1 (ID10); 3 June 2025 stage 1 hearings began (legal compliance, duty to co-operate); 5 February 2025 Inspectors' initial questions (ID01); 31 December 2024 Inspectors appointed (R A Bust, C Mulloy; G J Fort later added, announced 8 May 2026); submitted to the Secretary of State on 9 December 2024 (https://www.southandvale.gov.uk/joint-local-plan-2041-examination/). No main modifications consultation had been held and the Inspectors' report was not issued by 18 October 2026. The Inspectors examine it against 'the December 2023 version' of the NPPF (ID29). Earlier stages: Regulation 19 publication 1 October to 12 November 2024; Regulation 18 Preferred Options 10 January to 26 February 2024; Regulation 18 Issues 12 May to 23 June 2022 (https://www.southoxon.gov.uk/south-oxfordshire-district-council/planning-and-development/local-plan-and-planning-policies/local-plan-2041/joint-local-plan-consultations/).
- Oxfordshire New Minerals and Waste Plan (2042), to 2042
Early preparation, with no timetable. The County Council Cabinet 'approved a new Minerals and Waste Development Scheme' on 20 December 2022 to combine Parts 1 and 2 in one plan (https://www.oxfordshire.gov.uk/node/7783); the plan timetable page says 'there is currently no timetable for the Minerals and Waste Local Plan production' (https://www.oxfordshire.gov.uk/node/6387). No consultation stage was found. (Copied from the Cherwell entry of 17 October 2026.)
Free with any account
South Oxfordshire’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 10 zones
- 5 Article 4 directions, and what each removes
- 38 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in South Oxfordshire?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from South Oxfordshire’s own published plans and pages on 18 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.