GoPlanner

Councils

South Staffordshire Council local plan

The plans South Staffordshire Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • South Staffordshire Local Plan Review (South Staffordshire Local Plan 2023-2041), 2023 to 2041

    At examination, after consultation on the Main Modifications (14 May to 12 noon on 26 June 2026); the Inspectors' report had not been found on the council's pages by 21 November 2026. Completed steps: review began in 2018 ("We began the review of our current Local Plan in 2018"); Regulation 18 Issues and Options 2018 and Preferred Options November 2021; Regulation 19 Publication Plan November 2022 and again April 2024 (platform: published 2024-04-18); submitted to the Secretary of State "on 11th December, 2024" (https://www.sstaffs.gov.uk/planning/planning-policy/local-plan-review); Inspector Anne Jordan appointed (2 January 2025), replaced on 10 January 2025 by "K Ford MSC MRTPI and C Dillon BA (Hons) MRTPI"; Stage 1 hearings 27 to 30 May 2025; Inspectors' post-Stage 1 letter (SST/ED28, 2 July 2025) and the July 2025 hearings postponed; Duty to Co-operate consultation closed 5 September 2025; Inspectors' letter "confirming compliance with the Duty to Co-operate" (SST/ED44, 05.11.2025); Stage 2 hearings 18 to 26 November 2025 (Council opening statements SST/ED49A-J, Matters 7 to 16); Inspectors' post-Stage 2 letter (SST/ED51, 05.12.2025); further Inspectors' letters 06.02.2026 (SST/ED59A) and 14.04.2026 (SST/ED59); Schedule of Main Modifications (SST/ED60, "April 2026"; updated 17 April 2026) consulted on from Thursday 14 May to midday Friday 26 June 2026 (council bulletin of 15 May 2026, https://content.govdelivery.com/accounts/UKSSTAFFS/bulletins/417475d; public notice of 14/05/26, https://publicnoticeportal.uk/notice/planning/6a0512d0d9a900a2e9f8a0da); representations and the Council's responses published as SST/ED139 (uploaded 27.07.2026). MM002 to Policy DS1: "In total 38.1ha of land is removed from the Green Belt through this Plan" (https://www.sstaffs.gov.uk/sites/default/files/2026-05/Final%20Schedule%20of%20Main%20Modifications%20-%20South%20Staffordshire%20Local%20Plan%20-%20updated%20170426.(v.3)%20(1).pdf). Examination pages: https://www.sstaffs.gov.uk/local-plan-review-examination/examination-documents and https://www.sstaffs.gov.uk/local-plan-review-examination/latest-news-and-updates.

  • South Staffordshire new-style local plan ("Local plan 2029")

    Started under the 2026 plan-making regulations: the council's Local Plans Datasets page ("Last Updated 12.06.2026") points to "the new Local plan 2029 timetable" and says the council "will review the Local Plan timetable monthly" under "Regulation 6 of the Town and Country Planning (Local Planning) (England) Regulations 2026" (https://www.sstaffs.gov.uk/planning/planning-policy-and-local-plans/local-plans-datasets). The council's timetable and scoping pages could not be read. By planning.data.gov.uk's timetable (unconfirmed): notice of intention to commence 2 June 2026; scoping consultation 10 June to 22 July 2026; Gateway 1 self-assessment 30 October 2026; then plan content and evidence consultation June to July 2027, Gateway 2 September to October 2027, proposed plan consultation February to March 2028, Gateway 3 August to September 2028, examination submitted 2 October 2028, recommendations 30 March 2029, adoption 30 April 2029.

Free with any account

South Staffordshire Council’s figures

  • Five-year housing land supply, measured at 1 April 2024
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 15 Article 4 directions, and what each removes
  • 2 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in South Staffordshire Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from South Staffordshire Council’s own published plans and pages on 21 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.