GoPlanner

Councils

Staffordshire Moorlands District Council local plan

The plans Staffordshire Moorlands District Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Staffordshire Moorlands Local Plan Partial Review

    Early (Regulation 18-type) consultation on a draft partial review, opened 1 September 2026, under the 2012 Regulations as far as found. Endon with Stanley Parish Council's copy of the council's notice ("Staffordshire Moorlands Local Plan – Partial Review Consultation", posted 1 September 2026, https://endonwithstanley-pc.gov.uk/?p=72794): the review responds to the higher Standard Method requirement (a 55% increase) and poor delivery at some strategic sites; it changes strategic Policies SS 2 (Settlement Hierarchy), SS 3 (Future Provision and Distribution of Development) and SS 4 (Strategic Housing and Employment Land Supply), adds SS 8a (A50 Growth Corridor, expected in the Blythe Bridge / Forsbrook area, its extent to be set in a future review), replaces C2 with C2a (Outdoor and Indoor Sports Facilities) and C2b (Open Space), and deletes site policies DSL 1 (Horsecroft Farm, Leek) and DSR 3 (Ash Bank Road, Werrington); it makes no new site allocations. Drop-in sessions ran 2 to 11 September 2026 (Leek 2 September, Blythe Bridge 5 September, Cheadle 8 September, Biddulph 11 September). The closing date was not given in the copy read. Next: the council "will review all responses, make any necessary changes, and consult on a revised draft later in the autumn". Comments via https://staffsmoorlands-consult.objective.co.uk/kse/. planning.data.gov.uk records it as at "regulation-18" with no timetable (scaffold). Whether the revised draft has been published since was not established.

Free with any account

Staffordshire Moorlands District Council’s figures

  • Five-year housing land supply, measured at 1 April 2023
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 2 Article 4 directions, and what each removes
  • 9 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Staffordshire Moorlands District Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Staffordshire Moorlands District Council’s own published plans and pages on 21 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.