Stevenage local plan

The plans Stevenage decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Stevenage Borough Local Plan (New Plan)

    Not yet started in any published step. The adopted Partial Update (para 1.7F, p. 7): "the Council also committed to producing an entirely new Local Plan immediately upon the conclusion of the update process", to "align a new plan with the timetables of its neighbours and the emerging work on a joint strategic plan for the region" (para 1.7G). The Local Development Scheme approved by Cabinet on 4 June 2025, in effect from 10 June 2025, describes "a two-stage process": "Stage 1: Local Plan – Review and Partial Update" (now adopted, 22 July 2026) and "Stage 2: Local Plan – New Plan" (paras 1.14, LDS p. 4; https://www.stevenage.gov.uk/documents/planning-policy/local-development-scheme/local-development-scheme-june-2025.pdf); its timetable for the New Plan is a chart that could not be read as text. No notice of commencement, scoping consultation or other step of a new plan was found on the council's pages on 3 November 2026. For the record, the Partial Update's own steps (https://www.stevenage.gov.uk/planning-and-building-control/planning-policy/local-plan/local-plan-2026/examination-of-our-local-plan-partial-update-2011-2031/main-modifications-post-eip-hearings): Regulation 18, 5 July to 15 August 2024; Regulation 19, 21 November 2024 to 14 February 2025; Regulation 19 addendum, 24 June to 4 August 2025; submitted 15 August 2025; hearings 2 to 10 December 2025; Inspector's report 27 May 2026; adopted 22 July 2026.

Free with any account

Stevenage’s figures

  • Five-year housing land supply, measured at 1 April 2024
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 4 zones
  • 4 Article 4 directions, and what each removes
  • How the plan draws its settlements

Checking a property in Stevenage?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Stevenage’s own published plans and pages on 3 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.