Surrey Heath Borough Council local plan

The plans Surrey Heath Borough Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Surrey Heath Local Plan 2019-2038, 2019 to 2038

    At examination, awaiting the Inspector's report. Latest step: the Main Modifications consultation ran from 28 May to 9 July 2026, and the representations 'have been submitted to the Local Plan Inspector for his consideration ... prior to producing a report on the soundness of the Local Plan' (https://www.surreyheath.gov.uk/planning-and-building-control/planning-policy/development-plan/new-local-plan); the Programme Officer's page, last updated 29 July 2026, says the Inspector 'will consider the responses ... before completing and submitting his Final Report' (https://www.localplanservices.co.uk/shlocalplanexamination). The council's LDS page says 'it is now anticipated that the Inspectors Report for that Local Plan will be received in the Autumn 2026' (https://www.surreyheath.gov.uk/planning-and-building-control/planning-policy/development-plan/local-development-scheme). Earlier steps: Issues and Preferred Options consultation June to July 2018; Regulation 18 Draft Local Plan: Preferred Options 14 March to 9 May 2022; Regulation 18 Gypsy, Traveller and Travelling Showpeople additional site allocations 8 August to 19 September 2022; Regulation 19 Pre-Submission publication 7 August to 20 September 2024; submitted to the Secretary of State on 10 December 2024; Inspector L Crosby appointed 18 December 2024, replaced by T Hatfield BA (Hons) MPLAN MRTPI on 14 April 2025; hearing sessions from 16 September to 9 October 2025, with a further session, 'Hearing Sessions closed on the 8th December 2025'; the Inspector's post-hearings letter (ID8) published 22 January 2026. Examined against the 2023 Framework (paragraph 35, NPPF 2023, per the examination page). Not adopted.

  • Surrey Heath Local Plan Review 2040, 2026 to 2040

    Early preparation under the new plan-making system. The Executive agreed its timetable on 16 June 2026, in effect from 25 June 2026, when the notice of intention to commence plan preparation was published; a scoping consultation ran from 14 September to 19 October 2026, and a Call for Sites runs from 21 September to 2 November 2026. Next: the Gateway 1 self-assessment on 26 October 2026, which starts the 30-month process; consultation on proposed plan content in June to July 2027 and on the proposed plan in April to May 2028, both by West Surrey Council; submission October 2028; adoption April 2029. On 14 September 2026 the plan period was revised 'from 2026 to 2044 to 2026 to 2040' following the August 2026 Framework (https://www.surreyheath.gov.uk/planning-and-building-control/planning-policy/development-plan/local-plan-review-2040/timetable; https://www.surreyheath.gov.uk/planning-and-building-control/planning-policy/development-plan/local-plan-review-2040).

Free with any account

Surrey Heath Borough Council’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 5 zones
  • 8 Article 4 directions, and what each removes
  • 3 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Surrey Heath Borough Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Surrey Heath Borough Council’s own published plans and pages on 21 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.