Tamworth Borough Council local plan
The plans Tamworth Borough Council decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Tamworth Borough Council Local Plan 2006-2031, adopted 23 February 2016, 2006 to 2031
- Minerals Local Plan for Staffordshire (2015 to 2030), adopted 16 February 2017, 2015 to 2030
- Staffordshire and Stoke-on-Trent Joint Waste Local Plan 2010-2026, adopted 15 March 2013, 2010 to 2026
Emerging plans
- Tamworth Local Plan 2022-2043, 2022 to 2043
Pre-Submission (Regulation 19) consultation held and closed: the council's news release of 25 August 2026 says "The consultation opens on Monday 24 August" and "closes on Monday 5 October 2026", that "This plan covers the period from 2022 to 2043", and that "The final version of the local plan will go to full council for decision December 2026" before submission to the Planning Inspectorate (https://www.tamworth.gov.uk/council-launches-six-week-consultation-tamworths-draft-local-plan). The plan page: "Tamworth Borough Council has now published its Pre-Submission Local Plan for public consultation", running "until 11.59PM on the 5th of October 2026", with the Regulation 19 Policies Map (https://tamworth.gov.uk/sites/default/files/planning_docs/A0-Polices-Map-TBC-web-version-v1_0.pdf) and the plan (https://tamworth.gov.uk/sites/default/files/planning_docs/Local-Plan-2022-43-Draft-Consultation-Version-v1_3.pdf). Earlier step: Issues and Options consultation, "launched in September 2022 in line with the timetable set out in the LDS" (Authority Monitoring Report 2023-2024, https://www.tamworth.gov.uk/sites/default/files/planning_docs/Authorities-monitoring-report-2023_2024.pdf). Not yet submitted; no submission, examination or adoption dates were confirmed (the Local Development Scheme 2026-2029, which holds the timetable, could not be read).
Free with any account
Tamworth Borough Council’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 4 zones
- 5 Article 4 directions, and what each removes
- How the plan draws its settlements
Checking a property in Tamworth Borough Council?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Tamworth Borough Council’s own published plans and pages on 22 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
