GoPlanner

Councils

Trafford local plan

The plans Trafford decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Trafford Local Plan 2022-2039, 2022 to 2039

    Publication (Regulation 19) stage, not yet submitted. Earlier Regulation 18 consultations: Issues Paper, 23 July to 14 September 2018; draft Local Plan, 4 February to 18 March 2021; draft policies, 24 April to 12 June 2025; draft site allocations and designations, 22 September to 3 November 2025. The Executive approved the Publication Version on 20 July 2026, and on 21 July 2026 Council approved its submission to the Secretary of State after the period for representations, which ran from 6 August to 23:59 on 18 September 2026; a report on the representations is to go to Council before submission. The Local Development Scheme 2026-2029 (approved 21 May 2026) plans submission in December 2026, examination in spring 2027 and adoption in 2027/2028. It will replace the Core Strategy, the saved UDP policies and the Civic Quarter Area Action Plan, and does not revisit Places for Everyone's housing requirement, strategic allocations or Green Belt boundary. The council says its housing and employment requirements were prepared under the 2021 Framework and the rest under the December 2024 Framework. It is being prepared under the 2012 Regulations (the 'legacy' system), for which plans must be submitted by 31 December 2026, and committee reports of 22 September 2026 give its policies 'some weight' (second research pass, from https://democratic.trafford.gov.uk/documents/s55383/Agenda%20Item%206%20-%20Applications%20for%20permission%20to%20develop%20etc.pdf).

  • Greater Manchester Joint Minerals and Waste Plan

    Not yet formally started. The AGMA Executive Board agreed on 28 March 2025 to replace the 2012 Waste Plan and the 2013 Minerals Plan with a single joint plan, and each of the ten councils approved it in July 2025 (GMCA Minerals Authority Monitoring Report 2020-2025, paras 46 to 47; Trafford's Council considered it on 16 July 2025, agenda item 5). The GMCA says a plan timetable and formal notice to commence plan-making 'will be published in due course'; none had been published by 1 October 2026.

Free with any account

Trafford’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 6 zones
  • 2 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Trafford?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Trafford’s own published plans and pages on 1 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.