Tunbridge Wells local plan
The plans Tunbridge Wells decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Tunbridge Wells Borough Local Plan 2020-2038, adopted 10 December 2025, 2020 to 2038
- Kent Minerals and Waste Local Plan 2024-39, adopted 13 March 2025, 2024 to 2039
- Kent Mineral Sites Plan, adopted September 2020, 2019 to 2030
Emerging plans
- Tunbridge Wells Local Plan Review 2029, 2029 to 2044
Scoping (new 30-month plan-making system): notice of intention to commence plan preparation 26 June 2026; scoping consultation 'from 14 July 2026 until midnight on 11 August 2026'; call for sites extended 'until the 28 September 2026'. Next: Gateway 1 self-assessment 30 October 2026, starting the 30-month window; consultation on proposed plan content and evidence 2 March to 15 April 2027; Gateway 2 15 September 2027; Proposed Local Plan consultation 30 November 2027 to 28 January 2028; Gateway 3 10 July 2028; submission 9 October 2028; consideration of adoption by Full Council 30 April 2029 (timetable taking effect 26 June 2026).
Free with any account
Tunbridge Wells’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 13 Article 4 directions, and what each removes
- 12 neighbourhood plans, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Tunbridge Wells?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Tunbridge Wells’s own published plans and pages on 17 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
