GoPlanner

Councils

Uttlesford local plan

The plans Uttlesford decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Uttlesford Local Plan Review (Core Policy 2a)

    Not started, as far as found. Core Policy 2a of the adopted plan: "In the event that Uttlesford is unable to demonstrate a five-year supply of housing in accordance with appropriate national policy and guidance six months from adoption of the Local Plan, a Local Plan Review would become necessary." Six months from adoption was 25 September 2026. No decision to start a review, notice of intention or new Local Development Scheme was found on the council's pages; the last LDS found is October 2023 (Cabinet report of 17 February 2026, para 22).

  • Replacement Essex Minerals Local Plan 2025 to 2040 (Minerals Local Plan review), 2025 to 2040

    Regulation 18, the latest step found being the second Regulation 18 consultation. Essex County Council's page lists the completed stages: Regulation 18 consultation on proposed amendments to the 2014 plan in March/April 2021; a Call for Sites in February/March 2022; informal engagement on Policy S6 in February/March 2022; a second Call for Sites in September 2022; and a further Regulation 18 public consultation in February and March 2024 (6 February to 9 April 2024, per the existing plan page), re-run from May to July 2024 to include an omitted site. The county's news of 16 May 2024 said an amended plan with a draft list of Preferred Site allocations "will be subject to a further consultation this winter". No later step (Regulation 19, submission, examination) was found on the county's pages.

Free with any account

Uttlesford’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 4 zones
  • 12 Article 4 directions, and what each removes
  • 27 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Uttlesford?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Uttlesford’s own published plans and pages on 1 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.