Vale of White Horse local plan
The plans Vale of White Horse decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Vale of White Horse Local Plan 2031 Part 1: Strategic Sites and Policies, adopted 14 December 2016, 2011 to 2031
- Vale of White Horse Local Plan 2031 Part 2: Detailed Policies and Additional Sites, adopted 9 October 2019, 2011 to 2031
- Vale of White Horse Local Plan 2011 (saved Policy H5: Grove Airfield), adopted July 2006, to 2011
- Oxfordshire Minerals and Waste Local Plan: Part 1 - Core Strategy, adopted 12 September 2017, to 2031
- Oxfordshire Minerals and Waste Local Plan 1996 (saved area policies), adopted July 1996, to 2006
Emerging plans
- Joint Local Plan 2041 (South Oxfordshire and Vale of White Horse), 2021 to 2041 as submitted; the Inspectors (ID28, 15 September 2026) require the base date moved to 2025 and the period extended by a year
At examination; Stage 3 hearings under way at the Bee House, Milton, on 17, 18, 19, 24, 25 and 26 November 2026 (agendas ID33 to ID43; Hearings Programme ID31 updated 12 and 17 November 2026). Latest step: the councils' Joint Local Plan 2041 Proposed Modifications, Update to CSD01.1, November 2026 (LPA114), added on 17 November 2026; before it, the Note on Modifications to the Plan Period (LPA109) and draft flood risk updates (LPA110, LPA111) on 12 November 2026, and the Housing Land Supply Statements (LPA97, LPA98) on 7 October 2026. Steps, latest first: 1 October 2026 Stage 3 Regulation 24 notice (LPA96); 30 September 2026 Stage 3 hearings announced with Matters, Issues and Questions (ID29); 16 September 2026 the Inspectors' letter following the focused hearing (ID28, dated 15 September), finding that 'main modifications which adjust the Plan period's base date to 2025 are needed', that the plan period should be extended by a year, that the five-year supply be calculated from 1 April 2027, and that the December 2023 Framework applies under the transitional arrangements; 9 September 2026 focused hearing session; 29 July 2026 Inspectors' note on post-hearings consultation (ID25); Stage 2 hearings from 7 July 2026; 19 May 2026 Stage 2 hearings announced (ID19); 24 April 2026 Inspectors' letter on the way forward (ID16); 12 February 2026 Procedural Meeting on the Duty to Co-operate; 1 October 2025 Inspectors' letter after Stage 1 (ID10); Stage 1 hearings from 3 June 2025; 5 February 2025 Inspectors' preliminary matters and initial questions (ID01); 31 December 2024 Inspectors R A Bust, C Mulloy and G J Fort appointed; submitted for examination on 9 December 2024 (https://www.southandvale.gov.uk/joint-local-plan-2041-examination/). Earlier steps: Sustainability Appraisal Technical Addendum consultation 6 December 2024 to 17 January 2025; Regulation 19 publication 1 October to 12 November 2024; Preferred Options consultation 10 January to 26 February 2024; Regulation 18 Part 1 issues consultation 12 May to 23 June 2022 (https://whitehorsedc.gov.uk/vale-of-white-horse-district-council/planning-and-development/local-plan-and-planning-policies/local-plan-2041/joint-local-plan-consultations/). No main modifications consultation has been held yet.
- Oxfordshire New Minerals and Waste Plan (2042), to 2042
Early preparation, with no timetable. The County Council Cabinet 'approved a new Minerals and Waste Development Scheme' on 20 December 2022 to combine Parts 1 and 2 in one plan (https://www.oxfordshire.gov.uk/node/7783); the plan timetable page says 'there is currently no timetable for the Minerals and Waste Local Plan production' and a new one will follow the new plan-making regulations (https://www.oxfordshire.gov.uk/node/6387). No consultation stage was found. Copied from the Cherwell entry (17 October 2026).
Free with any account
Vale of White Horse’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 8 zones
- 1 Article 4 direction, and what each removes
- 21 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in Vale of White Horse?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Vale of White Horse’s own published plans and pages on 18 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.