Walsall Metropolitan Borough Council local plan
The plans Walsall Metropolitan Borough Council decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Black Country Core Strategy, adopted 3 February 2011, 2006 to 2026
- Black Country Core Strategy: waste policies WM1 to WM5 and minerals policies MIN1 to MIN5, adopted 3 February 2011, 2006 to 2026
- Walsall Site Allocation Document (SAD) and Local Plans Policies Map, adopted 7 January 2019
- Walsall Town Centre Area Action Plan, adopted 7 January 2019
- Walsall Unitary Development Plan (saved policies), as annotated in 2019, adopted 7 March 2005
Emerging plans
- Walsall Borough Local Plan (WBLP), to 2042, 2025 to 2042
Publication (Regulation 19) consultation closed; to be submitted by 31 December 2026. Black Country Plan ended by Cabinet on 2 November 2022, and work on the WBLP agreed in November 2022; call for sites, 2024; Cabinet agreed the Regulation 18 consultation on 15 October 2025; Regulation 18 (draft Issues and Preferred Options) consultation from 7 November 2025 to 19 December 2025 (the council's news releases and public notice; its Future planning policy page says 16 December 2025); LDS 13th revision effective October 2026; Regulation 19 publication consultation from 21 September 2026 to 2 November 2026, with alterations to the Green Belt boundary ('Green Belt Amendments' map); planned: preparing the submission November to December 2026, and submission to the Secretary of State 'by the 31 December 2026 to progress the plan under the existing / legacy plan-making system', under the transitional arrangement of the December 2024 Framework. Once adopted it will 'supersede the existing development plan documents' (BCCS, SAD, AAP and UDP) as 'one single plan'. The Regulation 18 draft gave a requirement of 1,168 homes a year (19,924 over the plan period, planning.data.gov.uk's record).
- West Midlands Spatial Development Strategy
Early preparation by the West Midlands Combined Authority, covering the seven metropolitan boroughs including Walsall; a first consultation from 3 November 2025, with a first draft 'most likely in 2027' (WMCA news release, as recorded in Wolverhampton's and Dudley's entries; not read for this entry).
Free with any account
Walsall Metropolitan Borough Council’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 2 Article 4 directions, and what each removes
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Walsall Metropolitan Borough Council?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Walsall Metropolitan Borough Council’s own published plans and pages on 16 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
