Warrington local plan
The plans Warrington decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Warrington Local Plan 2021/22 – 2038/39, adopted 4 December 2023, 2021/22 to 2038/39
Emerging plans
- Warrington Local Plan (new plan, including minerals and waste)
Early preparation under the new plan-making system: notice of commencement and the Local Plan Timetable on 16 April 2026; Scoping Consultation and Call for Sites 16 April to 1 June 2026; SEA scoping with statutory consultees 16 July to 20 August 2026; Gateway 1 self-assessment published on 21 September 2026, which starts the 30-month period; Plan Content and Evidence consultation from 17 November 2026 to 5pm on 11 January 2027 (https://www.warrington.gov.uk/update-warringtons-local-plan; https://www.warrington.gov.uk/gateway-1-self-assessment). The timetable of November 2026 gives Gateway 2 advice sought 1 June 2027, the proposed plan consultation 19 October to 14 December 2027, Gateway 3 advice sought 1 June 2028, submission for examination 3 July 2028, and the council considering adoption on 5 March 2029 (https://www.warrington.gov.uk/sites/default/files/2026-11/Warrington%20Local%20Plan%20Timetable%20-%20November%202026.pdf). 'The new Local Plan will also cover all issues relating to minerals and waste.'
Free with any account
Warrington’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 3 Article 4 directions, and what each removes
- 3 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in Warrington?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Warrington’s own published plans and pages on 23 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
