Watford local plan
The plans Watford decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Watford Local Plan: A Sustainable Town 2021-2038, adopted 17 October 2022, 2021 to 2038
- Hertfordshire Minerals Local Plan Review 2002-2016, adopted 27 March 2007, 2002 to 2016
- Hertfordshire Waste Development Framework: Waste Core Strategy and Development Management Policies Development Plan Document 2011-2026, adopted November 2012, 2011 to 2026
- Hertfordshire Waste Development Framework: Waste Site Allocations Development Plan Document 2011-2026, adopted July 2014, 2011 to 2026
Emerging plans
- Watford Local Plan Review 2029
Started under the 2026 plan-making system. Notice of intention to commence local plan preparation published on 14 October 2026 ("Watford Borough Council hereby gives notice that it is intending to commence preparation of a Review of the current Watford Local Plan (2021-2038)"; https://www.watford.gov.uk/downloads/file/3241/notice-of-intention-to-commence-local-plan-preparation). The council's timetable (last updated 14 October 2026) schedules a scoping consultation from 2 November to 11 December 2026, then Gateway 1 self-assessment on 8 March 2027, plan content and evidence consultation from 22 July to 17 September 2027, Gateway 2 advice sought on 13 December 2027, proposed plan consultation from 15 June to 11 August 2028, Gateway 3 advice sought on 6 November 2028, submission on 29 January 2029 and adoption on 3 September 2029 (https://www.watford.gov.uk/planning-policy-local-plan-1/watford-local-plan-review-2029/2; open data: https://www.watford.gov.uk/downloads/file/3240/local-plan-timetable-open-data, where only the notice has an actual date). The only completed step is the notice of 14 October 2026; no draft plan or policies yet.
- Hertfordshire Minerals and Waste Local Plan
In preparation by Hertfordshire County Council: "We are currently reviewing our Minerals and Waste Local Plan documents, through the preparation of a new Minerals and Waste Local Plan"; when adopted it will replace the Minerals Local Plan Review 2002-2016 and the two Waste DPDs. The county's page points to its Minerals and Waste Development Scheme for the stages; its stage on 3 November 2026 was not read from the scheme in this pass.
Free with any account
Watford’s figures
- Five-year housing land supply, measured at 1 April 2024
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 2 zones
- 3 Article 4 directions, and what each removes
- How the plan draws its settlements
Checking a property in Watford?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Watford’s own published plans and pages on 3 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
