The plans Wiltshire decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Wiltshire Local Plan

    Early stage, under the 2026 plan-making system. Cabinet approved preparing it on 25 June 2026, incorporating minerals and waste. The timetable and notice of intention to commence were due for publication by 30 June 2026 (officer decision OD_26-57 of 2 July 2026, which records a map correction on 1 July to exclude the New Forest National Park). The scoping consultation runs from 2 to 30 September 2026 (consultation portal, open), alongside an SEA scoping consultation (26 August to 30 September 2026) and a call for sites open since 29 June 2026. Timetable: Gateway 1 self-assessment by 30 October 2026; consultation on content and evidence 7 April to 19 May 2027; Gateway 2 advice sought 15 September 2027; consultation on the proposed plan 15 March to 10 May 2028; Gateway 3 on 1 August 2028; submission 31 October 2028; adoption 30 April 2029. The council reviews the timetable monthly. It replaces the Wiltshire Local Plan Review (Pre-Submission Draft 2020-2038). Full Council resolved on 19 May 2026 to withdraw that plan from examination (recorded vote 50 to 46, 1 abstention), following the Inspectors' letter of 27 February 2026. The withdrawal was formally notified on 22 May 2026 (OD_26-56), the date the Secretary of State gives in the Snarlton Farm decision (28 July 2026), which gives the withdrawn plan no weight.

Free with any account

Wiltshire’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 4 zones
  • 66 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Wiltshire?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Wiltshire’s own published plans and pages on 27 September 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.