Winchester local plan
The plans Winchester decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Winchester District Local Plan 2020 - 2040, adopted 24 March 2026, 2020 to 2040
- Hampshire Minerals & Waste Plan (2026), adopted 16 July 2026, to 2040
Emerging plans
- Winchester District Local Plan 2044, 2026 to 2044
Preparation under the new local plan system (Town and Country Planning (Local Planning) (England) Regulations 2026). Notice of intention to commence published 30 June 2026, and the local plan timetable had effect from 30 June 2026 (updated 18 September and 5 November 2026; version 3, https://www.localplan.winchester.gov.uk/assets/attach/2923/Local-Plan-timetable-version-3.csv). The scoping consultation ran from 18 September to 23:59 on 12 October 2026 (extended from 9 October). Gateway 1 was reached on 30 October 2026, with the self-assessment summary published (https://www.localplan.winchester.gov.uk/local-plan-2026-2044/key-topics/gateway-1). The timetable has the second consultation (proposed content and evidence) from 19 March to 30 April 2027, Gateway 2 on 4 January 2028, the third consultation (the proposed Local Plan) from 4 February to 31 March 2028, Gateway 3 on 7 July 2028, submission on 30 October 2028 and adoption on 30 April 2029, which the timetable says would be considered by 'the new Mid Hampshire Authority'. It will cover the district excluding the South Downs National Park, and will replace the Winchester District Local Plan 2040. On 30 June 2026 Cabinet agreed to explore joint plan-making across a proposed Mid Hampshire area, and the council says the timetable 'will need to be changed depending on the outcome'.
Free with any account
Winchester’s figures
- Five-year housing land supply, measured at 31 March 2025
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 3 zones
- 3 Article 4 directions, and what each removes
- 2 neighbourhood plans, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Winchester?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Winchester’s own published plans and pages on 6 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
